According to emplyers | According to types

The Bialystok Heat and Power Plant PLC

  • demineralized water tanks and installation (the Bialystok Heat and Power Plant
    Assembly of the K-5,6,7,8 ash removal electrofilters DAPAC system of ABB ZAMTECH production
  • workmanship of the ash removal crane's anti-corrosion protection
  • workmanship of the anti-fire sprinkle instalation in utility rooms as well as in the K-3 and K4 biolers' cable canals
  • workmanship of the accelerator's outer heating
  • modernisation of the supply and demineralizated water input
  • repaire of the raw water tanks V=2000m3 and V=3000m3
  • modernisation of the wagon tripper hoist devices
  • workmanship of the resin floor under the K-6 boiler electrofilter
  • modernisation of the conveyor devices
  • repair of the SUW I chemicals unloading canal

The "Biaform" Plywood Industry Plant PLC

  • workmanship of the heat centre
  • workmanship of the heat-water installation and centre, and central heating and c.w. installation

The Bialystok Water Board Ltd

  • repair of the ferroconcentrated tank rapid filter and workmanship of the insulation coating inside the tank
  • insulation of the filtering chamber internal wall in the Production Main Block's filters hall
  • protection of the bleaching boiler's inside chimney walls and ceilings with anti-chemical materials

Food Industry Plant PEPEES PLC in Lomza

  • repair of the steam bioler OR - 16/40

The Dojlidy Brewery in Bialystok

  • instalation workmanship of the boiler-room
  • montage of the oil boiler-room

Sewage-treatmnet Plant in Nowa Wies Elcka

  • cleaning (sand-blast cleaning and 400 bar high-pressure aggregate), chambers scratch and walls' crack injetion
  • repair of the fermentation chamber no. 1 with anti-chemical materials

Water Purification Plant in Elk

  • repair of the water aeration tank with anti-chemical materials

The Bialystok Furniture Factory PLC

  • repair of the BABCOK type water boiler
  • workmanship of the chimney (h=20 m)
  • compensation of the heatng piping
  • balancing of the fans

The Carpet Factory "Agnella" in Bialystok

  • workmanship of the steam system insulation
  • workmanship of the additions in the steam piping

Bridge Construction Plants Ltd in Warsaw

  • protection of the viaduct's concrete surface at the Northen Ring Road in Bialystok




Wykonane prace
Kontakt

Kontakt